Published figures for the UTRC. Detailed engineering drawings, electrical schedules and site-prep requirements are issued with the quote.
Weight, thermal load, ingress rating, fabric topology and rail dimensions will land here once engineering signs off the published sheet.
Each bay takes one USB cable; devices are identified from the device itself, never operator-typed.
Activation Lock and FRP are checked before anything is erased.
NIST SP 800-88 Rev. 2 Clear via Apple Configurator 2 or ADB, tool and version recorded.
The result is confirmed per device and written as PASS, FAIL or QUARANTINED.
Apex software issues the per-device certificate and appends it to the custody log.
Recorded by Apex software on this machine, with the method and tool version written into every record.
These are being finalized for the UTRC. Ask us for current availability and we'll send what exists today.
Optional modules and expansions that extend what the machine handles.
Consumables and field-replaceable parts to keep a unit in service.
Published PDFs for evaluation, procurement and installation.